
Cowboy Shed: Progress Update IV
January 30th, 2025 | LN | Construction Progress
Winter is here, siding is installed and the installation of interior finishes is underway. The corrugated Corten steel roof installation will commence in the next month with cabinetry arriving at the February. The following photos are from earlier this morning.
Project description: the home is sited on the seam between forest and pasture, occupying the tree line like the local wildlife, hesitant to expose themselves to danger in the open meadow. The home is dwarfed by the trees to the west, effectively blending it into the backdrop of the woods and creating moments of intimacy or long views for different program along the length of the structure. The home exposes its broadside to the east, opening to views of the Gros Ventre range across the meadow and welcoming morning light.
Progress Update III
For renderings and more information about the project, check it out here.